FM 3083
The scope of this study is a 3.5-mile section of Farm-to-Market (FM) 3083 from IH 45 to Loop 336. Also included is a grade separation over the Union Pacific Railroad (UPRR).
Current conditions
The current road is undivided with two, 12-foot travel lanes.
Proposed Improvements
Proposed improvements to FM 3083 include:
- Two, 12-foot travel lanes in each direction with a 10-foot shoulder.
- A 16-foot wide raised median with left-turn lanes at directional openings and full openings at major intersections.
- The construction of a new grade separation over the UPRR.
- All work would be completed within the existing ROW.
Partners
This study is a partnership between TxDOT and the Federal Highway Administration.
Public involvement
- Public Meeting - April 7, 2009